DVM - Design Verification Module

Impedance() Test Objective

The purpose of the Impedance() test is to measure either the input or output impedance depending on whether the reference designator is a DVM source or load.

Since the test objective does not specify the input voltage nor the output current, you must provide these values in the Source and Load columns in the testplan.

Both a POP and an AC analysis are used in the Impedance() test.

The POP and AC analysis directives are taken from the POP Analysis page and the AC Analysis page of the Full Power Assist DVM control symbol. The AC Analysis page is shown below.

The test report includes gain, phase, frequency, source, and load graphs as well as the following scalar values which are defined in the Measured Scalar Values section below:

  • Efficiency
  • Power({load_name})
  • Power({source_name})
  • min_src1_gain
  • max_src1_gain
  • min_src1_gain_freq
  • max_src1_gain_freq
  • sw_freq

In this Topic Hide

Testplan Syntax

The Impedance() function has the following syntax with the argument described in the table below:

Impedance(REF)

Argument Range Description
REF

n/a

The actual reference designator of the DVM source or load or the generic syntax of INPUT:n or OUTPUT:n where n is an integer indicating a position in the list of managed DVM sources or loads. 

Source and Load Subcircuit Configuration

The Impedance() test objective sets the source and load subcircuits to the following:

Source Load
DC Impedance Source

 Resistive Load

DC Input Source

Impedance Load

Loads other than the output under test are set to the Resistive Load. All other sources are set to the DC Input Source.

Measured Scalar Values

The Impedance() test objective measures the following scalar values,where {load_name} and {src_name} are replaced by the actual load name source name:

Scalar Name

Description

Efficiency The overall efficiency of the converter taken from the POP simulation
Power(LOAD{load_name) The power of each input source taken from the POP simulation
Power(SRC{load_name}) The power of each output load taken from the POP simulation
min_src1_gain The minimum value for the gain during the AC analysis.
max_src1_gain The maximum value for the gain during the AC analysis.
min_src1_gain_freq The frequency where the gain is at its minimum value
max_src1_gain_freq

The frequency where the gain is at its maximum value
sw_freq A number which represents the converter switching frequency. This scalar is generated from a fixed probe with curve label DVM Frequency. For more information, see Measuring the Switching Frequency.
   
AVG(V{load_name}) AVG(I{load_name})
MIN(V{load_name}) MIN(I{load_name})
MAX(V{load_name}) MAX(I{load_name})
RMS(V{load_name}) RMS(I{load_name})
PK2PK(V{load_name}) PK2PK(I{load_name})
The Average, Minimum, Maximum, RMS and Peak-to-Peak values for each load voltage and current taken over the entire simulation time window.
   
AVG(V{src_name}) AVG(I{src_name})
MIN(V{src_name}) MIN(I{src_name})
MAX(V{src_name}) MAX(I{src_name})
RMS(V{src_name}) RMS(I{src_name})
PK2PK(V{src_name}) PK2PK(I{src_name})
The Average, Minimum, Maximum, RMS and Peak-to-Peak values for each source voltage and current taken over the entire simulation time window.

Measured Specification Values

In the following table, {load_name} is the name assigned to each load. The default value is LOAD. DVM forces each load name to be unique so that the scalar and specification values for each load are unique.

Specification Name

PASS/FAIL Criteria

Min_V{load_name}

The minimum value of the output voltage during the simulation time is greater that the minimum specification value.

Max_V{load_name}

The maximum value of the output during the simulation time is less than the maximum specification value.

Testplan Example

The Impedance() test objective is used in several built-in testplans. Shown below are an input and an output test from the DC/DC 1 input/1 output testplan.  The managed source and load designators INPUT:1 and OUTPUT:1 are defined in the Full Power Assist DVM control symbol. The tests configures the source to use the Nominal symbolic value from the DC Input page and configures the load based on the Light symbolic value from the Output page. The first test is an input impedance test and the second test is an output impedance test.

*?@ Analysis Objective Source Load Label
Ac Impedance(INPUT:1) SOURCE(INPUT:1, Nominal) LOAD(OUTPUT:1, Light) Ac Analysis|Input Impedance|Vin Nominal|Light Load
Ac Impedance(OUTPUT:1) SOURCE(INPUT:1, Nominal) LOAD(OUTPUT:1, Light) Ac Analysis|Output Impedance|Vin Nominal|Light Load

Test Report

You can view the complete test report in a new browser window here: Output Impedance Test Report. Below is an interactive link to the same test report.

© 2015 simplistechnologies.com | All Rights Reserved